Kris and I spent most of today finishing up our fall barn project: a new water line from the freeze proof faucet to the stock tank. Which means - Dave won't have to carry 100 gallons of water (in 20 gallon buckets) twice a day through the barn lot this winter! I won't get "bucket elbow" this year!
The system uses 70 feet of 3/4" PVC pipe, and about 6 feet of refitted rubber garden hose. It's sloped from faucet to tank at about 10° for most of the run, falling some 12 feet. This includes a 90° drop of about 4 feet where we come out of the wall, and a 45° drop and run of about 2 feet to get down to the post line for attachment to the existing paddock fence. It drains perfectly too, and even has a fitting for the summer connection to the float valve, and a shut-off ball valve which will make cleaning the tank out a whole lot easier.
Quite a project, and one that had been on the burner for at least a year. We did it right the first time through - no leaks and no puddles! A little planning goes a long way, indeed!
All that remains to be done to get ready for the snow is to mount the window back into the main hen house, so they can get light but not airflow, and rig up the interior heaters and lights - we finished repairing the outside electrical stuff today, too. All in all a very busy and productive day.
/Home | 0 writebacks | permanent link
comment...